Funding entity Bombardier European Investments S.L.U
Participated by Metro de Barcelona
The objective of this project is the design and implementation of ATO speed commands in Line 3 of Metro de Barcelona to minimise the energy consumption. These ATO speed commands are selected and sent to the train by the traffic regulation system in real-time. For each inter-station a set of 4 speed commands are designed, the flat out command and 3 commands parameterized basically by a coast point and a regulation speed.
MARBOML3